GovWatch

Projects

Browse and search all community projects across Nigeria.

Showing 22012300 of 4,518 projects

Page 23 of 46

📦 Procurement - Equipment
Not Started

Ups: 93 Units@ Bhq (93 X N20,000)

State Wide, Nasarawa
Budget₦1,860,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Computer Table: 93 Units @ Bhq (93 X N30,000)

State Wide, Nasarawa
Budget₦2,790,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Hp Photocopiers: 4 Units @ Bhq (4 X N800,000)

State Wide, Nasarawa
Budget₦3,200,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

2 Units Per Facility (4 New Facilities X N800,000)

State Wide, Nasarawa
Budget₦6,400,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Stabilizers: 4 @ Bhq (4 X N100,000)

State Wide, Nasarawa
Budget₦400,000

0% complete

0 0
🏥 Health📦 Procurement - Equipment
Not Started

Purchase of 5no. Digital Ultra Sound Machines 1 Unit Per Facility @ G.h. Garaku&4no. New Gen. Hospitals (5no. Facilities X N6,000,000)

State Wide, Nasarawa
Budget₦30,000,000

0% complete

0 0
🏥 Health📦 Procurement - Equipment
Not Started

Purchase of 2no. Digital X-Ray Machines 1 Unit Per Facility @ Gen. Hospitals N/Eggon&Gudi (2no. Facilities X N30,000,000)

State Wide, Nasarawa
Budget₦60,000,000

0% complete

0 0
🏥 Health📦 Procurement - Equipment
Not Started

Installation of 1no. Medical Records System (emrs) with 1 Year Subscription @ Bhq (1 X

State Wide, Nasarawa
Budget₦6,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

N6,000,000) Purchase of 1no. Ict Equipment Each @ Mcmg, G.hs. Nasarawa, Doma, Akwanga, Gudi, Keffi, N/Eggon, Obi&Awe.(9 Facilities X N6,000,000)

State Wide, Nasarawa
Budget₦54,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Beds: 35 Units Per Facility = 140 (4 New Facilities X N350,000)

State Wide, Nasarawa
Budget₦49,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Pillows: 35 Units Per Facility = 140 (4 New Facilities X N4,000)

State Wide, Nasarawa
Budget₦560,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Matterasses 35 Units Per Facility = 140 (4 New Facilities X N40,000)

State Wide, Nasarawa
Budget₦5,600,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Machintosh 140x2 Units Per Facility = 280 (4 New Facilities X N1,000)

State Wide, Nasarawa
Budget₦280,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Bedspreads 140x2 Units Per Facility = 280 (4 New Facilities X N2,000)

State Wide, Nasarawa
Budget₦560,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Blankets 2 Units Per Bed = 280 (4 New Facilities X N6,000)

State Wide, Nasarawa
Budget₦1,680,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Chest Table : 35 Units Per Facility = 140 (4 New Facilities X N15,000)

State Wide, Nasarawa
Budget₦2,100,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Draw Sheet 2 Units Per Bed = 280 (4 New Facilities X N1,000)

State Wide, Nasarawa
Budget₦280,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Mcmg, G.hs. Keffi, Nasarawa, N/Eggon, Doma&Akwanga (15 Matterases, 15 Pillows&40 Bedspreads) Each

State Wide, Nasarawa
Budget₦10,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

G.hs. Panda, Toto, Umaisha, M/Udege, Uke, Garaku, Wamba, Keana, Agbashi, Awe&Obi (200no Matterases, 200no. Pillows&570no. Bedspreads)

State Wide, Nasarawa
Budget₦9,940,000

0% complete

0 0
💧 Water & Sanitation
Not Started

Respectively Drilling&Reticulation @ 4 New Facilities X N3,750,000

State Wide, Nasarawa
Budget₦15,000,000

0% complete

0 0
🏥 Health
Not Started

Construction of 2no. Wards @ 2no. Facilities (gen. Hospitals Gudi&Azara)

State Wide, Nasarawa
Budget₦120,000,000

0% complete

0 0
🏥 Health
Not Started

Construction of 2no. Theatre Complex @ 2no. Facilities (gen. Hospitals Gudi&Azara)

State Wide, Nasarawa
Budget₦80,000,000

0% complete

0 0
🏥 Health
Not Started

Construction of 2no. Lab Complex @ 2no. Facilities (gen. Hospitals Gudi&Azara)

State Wide, Nasarawa
Budget₦60,000,000

0% complete

0 0
🏥 Health
Not Started

Construction of 2no. Admin Complex @ 2no. Facilities (gen. Hospitals Gudi&Azara)

State Wide, Nasarawa
Budget₦40,000,000

0% complete

0 0
📋 Other
Not Started

Construction of 1no. Patients' Relations Laterine @ 4no. New Facilities and G.h. Keana @ N3,000,000 Each. (5 Facilities X N3,000,000)

State Wide, Nasarawa
Budget₦15,000,000

0% complete

0 0
🚗 Procurement - Vehicles
Not Started

Purchase of 1 no. Toyota Hilux Vehicles

State Wide, Nasarawa
Budget₦80,000,000

0% complete

0 0
🚗 Procurement - Vehicles
Not Started

Purchase of 1 no. Hiace Toyota Bus

State Wide, Nasarawa
Budget₦40,000,000

0% complete

0 0
📦 Procurement - Equipment📐 Land & Urban Planning
Not Started

Purchase of 2 no. Metallic Dictator

State Wide, Nasarawa
Budget₦25,000,000

0% complete

0 0
🏛️ Government Buildings📦 Procurement - Equipment
Not Started

Purchase of 50 no. Tables and 150 no. Chairs

State Wide, Nasarawa
Budget₦15,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Purchase of 6 nos Hp Dekstop Computers

State Wide, Nasarawa
Budget₦5,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Purchase of Ict Equipment (3 no. Core 10 Laptops and 3in1 Printers

State Wide, Nasarawa
Budget₦7,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Purchase of Herbicide, Fumigation Promisee Use for Sanitation

State Wide, Nasarawa
Budget₦15,000,000

0% complete

0 0
🚗 Procurement - Vehicles
Not Started

Purchase of 2 no Bajaj Motorcycle

State Wide, Nasarawa
Budget₦2,000,000

0% complete

0 0
🌾 Agriculture & Environment📦 Procurement - Equipment
Not Started

Purchase of Forestry Equipment

State Wide, Nasarawa
Budget₦10,000,000

0% complete

0 0
🌾 Agriculture & Environment
Not Started

Purcahse of Ballistic and Medication for Hippopotamus

State Wide, Nasarawa
Budget₦12,000,000

0% complete

0 0
🏛️ Government Buildings
Not Started

Renovation/Remodeling of Head Office Building at Lafia

State Wide, Nasarawa
Budget₦30,000,000

0% complete

0 0
🌾 Agriculture & Environment
Not Started

Purchase of Assorted Seedling

State Wide, Nasarawa
Budget₦10,000,000

0% complete

0 0
💰 Investment & Economic Dev
Not Started

Industrial Pollution, Prevention and Control

State Wide, Nasarawa
Budget₦50,000,000

0% complete

0 0
📋 Other
Not Started

Establishment of Forest Nurseries at Lafia

State Wide, Nasarawa
Budget₦30,000,000

0% complete

0 0
🏗️ Commerce & Infrastructure
Not Started

Construction of Drainages Across the State

State Wide, Nasarawa
Budget₦50,000,000

0% complete

0 0
💰 Investment & Economic Dev
Not Started

Industrial Pollution, Prevention and Control Lafia Akwanga and Karu

State Wide, Nasarawa
Budget₦25,000,000

0% complete

0 0
💧 Water & Sanitation
Not Started

Water Pollution Prevention and Control Lafia

State Wide, Nasarawa
Budget₦20,000,000

0% complete

0 0
🌾 Agriculture & Environment
Not Started

Mitigation and Adaptation of Small Farmers (climate Change)

State Wide, Nasarawa
Budget₦25,000,000

0% complete

0 0
🏫 Education
Not Started

Construction of Mineral Laboratory at Awe, Nasarawa Eggon,nasrawa and Obi Lga

State Wide, Nasarawa
Budget₦300,000,000

0% complete

0 0
💰 Investment & Economic Dev
Not Started

Upgrading of Recycling Plants Im the Sate

State Wide, Nasarawa
Budget₦25,000,000

0% complete

0 0
💰 Investment & Economic Dev
Not Started

Purchase of Clean Cooking Stovesto the Less Previllage Are Across 13 Lga of the State

State Wide, Nasarawa
Budget₦25,000,000

0% complete

0 0
📐 Land & Urban Planning
Not Started

Capital Allocation for Agro-Climatic Resilience in Semi-Arid Landscapes (acresal) Project Intervention in Keffi&Nasarawa Lga

State Wide, Nasarawa
Budget₦270,000,000

0% complete

0 0
💧 Water & Sanitation
Not Started

Water Drainning of Ado River in Karu

State Wide, Nasarawa
Budget₦400,000,000

0% complete

0 0
📋 Other
Not Started

Gully Erosion Control in Keffi/Nasarawa/Toto and Doma

State Wide, Nasarawa
Budget₦400,000,000

0% complete

0 0
💧 Water & Sanitation
Not Started

Water Pollution&Control at River Amba&Other Rivers in the State

State Wide, Nasarawa
Budget₦15,000,000

0% complete

0 0
🚗 Procurement - Vehicles
Not Started

Purchase of 1no Refuse Collection Vehicles/Plants

State Wide, Nasarawa
Budget₦108,405,800

0% complete

0 0
🚗 Procurement - Vehicles
Not Started

Purchase of 2nos Septic Tank Emptier

State Wide, Nasarawa
Budget₦400,000,000

0% complete

0 0
🌾 Agriculture & Environment📦 Procurement - Equipment
Not Started

Purchase of Street Sweeping Tools/Plants

State Wide, Nasarawa
Budget₦28,000,000

0% complete

0 0
💰 Investment & Economic Dev
Not Started

Disilting and Cleaning of Drainages

State Wide, Nasarawa
Budget₦15,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Purchase of Ict Accessories

State Wide, Nasarawa
Budget₦10,000,000

0% complete

0 0
🏗️ Commerce & Infrastructure
Not Started

Acquisition of Refuse/Sewage Disposal Site

State Wide, Nasarawa
Budget₦153,000,000

0% complete

0 0
🏛️ Government Buildings
Not Started

Rehabilitation of Office Building Complex

State Wide, Nasarawa
Budget₦42,405,800

0% complete

0 0
🚗 Procurement - Vehicles
Not Started

Purchase of 3 Nos.baja Motor Cycles

State Wide, Nasarawa
Budget₦3,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Purchase of 5 no. Hp Laptops&1 nos Hpp Desktop Computer

State Wide, Nasarawa
Budget₦6,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Purchase of 2 no. Hp Printers

State Wide, Nasarawa
Budget₦1,300,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Purchase of 1 no. Photocopier

State Wide, Nasarawa
Budget₦800,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Purchase of Scanning Machine&Accessories

State Wide, Nasarawa
Budget₦150,000

0% complete

0 0
🏫 Education📦 Procurement - Equipment
Not Started

Purchase of Teaching&Learning Aids

State Wide, Nasarawa
Budget₦3,500,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Purchase of 2nos Digital Camera&Accessories

State Wide, Nasarawa
Budget₦3,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Purchase of 1 no. Server (vm Host) Hardware

State Wide, Nasarawa
Budget₦300,000

0% complete

0 0
💰 Investment & Economic Dev🤝 Social Services & Admin
Not Started

Purchase of Food Items for Vulnerable People Across the State/Social Investment

State Wide, Nasarawa
Budget₦500,000,000

0% complete

0 0
🏛️ Government Buildings📦 Procurement - Equipment
Not Started

Purchase of Executive Cushion for Zonal Inspectorate Offices in 13 Lgas

State Wide, Nasarawa
Budget₦15,000,000

0% complete

0 0
🏛️ Government Buildings📋 Other
Not Started

Lafia Renovation of Emirs/Chiefs Palaces at 13 Lgas

State Wide, Nasarawa
Budget₦200,000,000

0% complete

0 0
📦 Procurement - Equipment🏗️ Commerce & Infrastructure+1
Not Started

Purchase of Working Implements/Equipment (lipw)

State Wide, Nasarawa
Budget₦17,000,000

0% complete

0 0
🏥 Health📦 Procurement - Equipment
Not Started

Purchase and Supply of Basic Clinical Equipment and Hospital Consumables to 50 Phcs Across 13

State Wide, Nasarawa
Budget₦9,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Lgas Purchase of 4nos. Hp Computer Laptops and Other Accessories

State Wide, Nasarawa
Budget₦10,800,000

0% complete

0 0
Power & Energy
Not Started

Construction of Power and Electrification in Some Communities of 13 Lga Azara, Kadorko

State Wide, Nasarawa
Budget₦200,000,000

0% complete

0 0
💧 Water & Sanitation Power & Energy
Not Started

,jangwa Etc. Drilling of Boreholes(solar ,hand Pump Etc) in Some Communities of 13 Lga

State Wide, Nasarawa
Budget₦1,700,000,000

0% complete

0 0
🏗️ Commerce & Infrastructure
Not Started

Construction of Drainage Network Across 13 Lga

State Wide, Nasarawa
Budget₦230,000,000

0% complete

0 0
💰 Investment & Economic Dev
Not Started

Strategic Resource Mobolization&Sustainabilty Plan

State Wide, Nasarawa
Budget₦481,000,000

0% complete

0 0
🏫 Education🏥 Health
Not Started

Construction of School,hospitals in the Communities

State Wide, Nasarawa
Budget₦1,380,000,000

0% complete

0 0
📦 Procurement - Equipment
Not Started

Repairs of 5nos Implement and Tools

State Wide, Nasarawa
Budget₦80,000,000

0% complete

0 0
🛣️ Roads & Transport
Not Started

Construction of Other Rural Feeder Roads in the State

State Wide, Nasarawa
Budget₦12,030,000,000

0% complete

0 0
💧 Water & Sanitation
Not Started

Reticulation for Toto Water Scheme

Toto, Nasarawa
Budget₦30,000,000

0% complete

0 0
🏥 Health🏛️ Government Buildings+1
Not Started

Rehabilitation @ General Hospital, Toto

Toto, Nasarawa
Budget₦5,000,000

0% complete

0 0
🏫 Education
Not Started

Renovation of Block a at Gss Wamba

Wamba, Nasarawa
Budget₦15,000,000

0% complete

0 0
🏫 Education
Not Started

Renovation of Science Laboratory at Gss Wamba

Wamba, Nasarawa
Budget₦27,561,299

0% complete

0 0
🏥 Health🏛️ Government Buildings
Not Started

Construction of Fence @ General Hospital, Wamba

Wamba, Nasarawa
Budget₦40,000,000

0% complete

0 0
🚗 Procurement - Vehicles
Not Started

Purchases of 1no. Hilux Vans

State Wide, Nasarawa
Budget₦50,000,000

0% complete

0 0
📋 Other
Not Started

Research and Development

State Wide, Nasarawa
Budget₦10,000,000

0% complete

0 0
🏫 Education🏥 Health
Not Started

Upgrading of College Clinic

Akwanga, Nasarawa
Budget₦25,000,000

0% complete

0 0
Power & Energy
Not Started

Purchase of 1 no. 9kva Mikano Plant Generator

Akwanga, Nasarawa
Budget₦18,000,000

0% complete

0 0
🌾 Agriculture & Environment🏗️ Commerce & Infrastructure
Not Started

Contruction of Abattoirs at Lafia

Akwanga, Nasarawa
Budget₦45,000,000

0% complete

0 0
🚗 Procurement - Vehicles📦 Procurement - Equipment+1
Not Started

Construction of Gwanje Truck Park, Using Earthzyme and Dust Stop Technology (6.7km)

Akwanga, Nasarawa
Budget₦264,517,569

0% complete

0 0
🏛️ Government Buildings
Not Started

Renovation of Nasarawa Akwanga Area Offices

Akwanga, Nasarawa
Budget₦65,000,000

0% complete

0 0
🛣️ Roads & Transport
Not Started

Contruction of Byepass to Link Keffi Akwanga Road to Akwanga Jos Road

Akwanga, Nasarawa
Budget₦33,000,000

0% complete

0 0
🛣️ Roads & Transport
Not Started

Contruction of Dualization to Connect Keffi-Gudi-Akwanga Through Akwanga Town

Akwanga, Nasarawa
Budget₦903,000,000

0% complete

0 0
🏗️ Commerce & Infrastructure
Not Started

Construction of Trailer Park at Gudi

Akwanga, Nasarawa
Budget₦1,000,000,000

0% complete

0 0
🏫 Education🏛️ Government Buildings
Not Started

Renovation of Block of Classrooms/Office at Gss Akwanga

Akwanga, Nasarawa
Budget₦26,000,000

0% complete

0 0
🏫 Education Youth, Sports & Culture
Not Started

Renovation of 3 nos Classrooms Block at Sport Academy Akwanga

Akwanga, Nasarawa
Budget₦12,000,000

0% complete

0 0
🏫 Education
Not Started

Renovation of Classroom Block/Admin Block at Gss Tunga

Akwanga, Nasarawa
Budget₦25,000,000

0% complete

0 0
🏫 Education
Not Started

Renovation of Classroom Block/Admin Block at Gss Akwanga North

Akwanga, Nasarawa
Budget₦25,000,000

0% complete

0 0
🏫 Education
Not Started

Renovation of a Block of 3 Classroom at Gss Andaha

Akwanga, Nasarawa
Budget₦15,800,000

0% complete

0 0
🏫 Education
Not Started

Construction of Blocks of 3 Classrooms in Akwanga Lga

Akwanga, Nasarawa
Budget₦3,652,650,979

0% complete

0 0
🚗 Procurement - Vehicles
Not Started

Purchase of 6 no. Toyoto Corrolla (2010) Official Vehicles

Akwanga, Nasarawa
Budget₦80,000,000

0% complete

0 0